Skip to content

MCO-2171: Switch cloud mco-disruptives to use longrun flow#76918

Merged
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
djoshy:mco-disrpt-longrun
Mar 26, 2026
Merged

MCO-2171: Switch cloud mco-disruptives to use longrun flow#76918
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
djoshy:mco-disrpt-longrun

Conversation

@djoshy
Copy link
Copy Markdown
Contributor

@djoshy djoshy commented Mar 26, 2026

This switches the cloud mco-disruptive suites to use the longrun test flow. This would allow it to handle the additional tests added by openshift/machine-config-operator#5808.

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Mar 26, 2026
@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@djoshy: This pull request explicitly references no jira issue.

Details

In response to this:

This switches the cloud mco-disruptive suites to use the longrun test flow. This would allow it to handle the additional tests added by openshift/machine-config-operator#5808.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 26, 2026
@djoshy djoshy changed the title NO-ISSUE: Switch cloud mco-disruptives to use longrun flow MCO-2171: Switch cloud mco-disruptives to use longrun flow Mar 26, 2026
@openshift-ci-robot
Copy link
Copy Markdown
Contributor

openshift-ci-robot commented Mar 26, 2026

@djoshy: This pull request references MCO-2171 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

This switches the cloud mco-disruptive suites to use the longrun test flow. This would allow it to handle the additional tests added by openshift/machine-config-operator#5808.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

[REHEARSALNOTIFIER]
@djoshy: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
periodic-ci-openshift-machine-config-operator-release-5.0-periodics-e2e-aws-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-gcp-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-azure-mco-disruptive N/A periodic Periodic changed
periodic-ci-openshift-machine-config-operator-release-4.23-periodics-e2e-vsphere-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-aws-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-4.23-periodics-e2e-gcp-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-vsphere-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-5.0-periodics-e2e-azure-mco-disruptive N/A periodic Periodic changed
periodic-ci-openshift-machine-config-operator-release-4.23-periodics-e2e-azure-mco-disruptive N/A periodic Periodic changed
periodic-ci-openshift-machine-config-operator-release-5.0-periodics-e2e-gcp-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-5.0-periodics-e2e-vsphere-mco-disruptive N/A periodic Ci-operator config changed
periodic-ci-openshift-machine-config-operator-release-4.23-periodics-e2e-aws-mco-disruptive N/A periodic Ci-operator config changed

Prior to this PR being merged, you will need to either run and acknowledge or opt to skip these rehearsals.

Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@sergiordlr
Copy link
Copy Markdown
Contributor

/lgtm

Thank you!

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 26, 2026
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci bot commented Mar 26, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: djoshy, sergiordlr

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@djoshy
Copy link
Copy Markdown
Contributor Author

djoshy commented Mar 26, 2026

/pj-rehearse periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-gcp-mco-disruptive

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@djoshy: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@djoshy
Copy link
Copy Markdown
Contributor Author

djoshy commented Mar 26, 2026

/pj-rehearse ack

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@djoshy: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Mar 26, 2026
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci bot commented Mar 26, 2026

@djoshy: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-gcp-mco-disruptive 165606f link unknown /pj-rehearse periodic-ci-openshift-machine-config-operator-release-4.22-periodics-e2e-gcp-mco-disruptive

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-merge-bot openshift-merge-bot bot merged commit 3602000 into openshift:main Mar 26, 2026
15 of 16 checks passed
memodi pushed a commit to memodi/release that referenced this pull request Mar 27, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants